OneStopTesting - Quality Testing Jobs, eBooks, Articles, FAQs, Training Institutes, Testing Software, Testing downloads, testing news, testing tools, learn testing, manual testing, automated testing, load runner, winrunner, test director, silk test, STLC

Forum| Contact Us| Testimonials| Sitemap| Employee Referrals| News| Articles| Feedback| Enquiry
 
Testing Resources
 
  • Testing Articles
  • Testing Books
  • Testing Certification
  • Testing FAQs
  • Testing Downloads
  • Testing Interview Questions
  • Career In Software Testing
  • Testing Jobs
  • Testing Job Consultants
  • Testing News
  • Testing Training Institutes
  •  
    Fundamentals
     
  • Introduction
  • Designing Test Cases
  • Developing Test Cases
  • Writing Test Cases
  • Test Case Templates
  • Purpose
  • What Is a Good Test Case?
  • Test Specifications
  • UML
  • Scenario Testing
  • Test Script
  • Test Summary Report
  • Test Data
  • Defect Tracking
  •  
    Software testing
     
  • Testing Forum
  • Introduction
  • Testing Start Process
  • Testing Stop Process
  • Testing Strategy
  • Risk Analysis
  • Software Listings
  • Test Metrics
  • Release Life Cycle
  • Interoperability Testing
  • Extreme Programming
  • Cyclomatic Complexity
  • Equivalence Partitioning
  • Error Guessing
  • Boundary Value Analysis
  • Traceability Matrix
  •  
    SDLC Models
     
  • Introduction
  • Waterfall Model
  • Iterative Model
  • V-Model
  • Spiral Model
  • Big Bang Model
  • RAD Model
  • Prototyping Model
  •  
    Software Testing Types
     
  • Static Testing
  • Dynamic Testing
  • Blackbox Testing
  • Whitebox Testing
  • Unit Testing
  • Requirements Testing
  • Regression Testing
  • Error Handling Testing
  • Manual support Testing
  • Intersystem Testing
  • Control Testing
  • Parallel Testing
  • Volume Testing
  • Stress Testing
  • Performance Testing
  • Agile Testing
  • Localization Testing
  • Globalization Testing
  • Internationalization Testing
  •  
    Test Plan
     
  • Introduction
  • Test Plan Development
  • Test Plan Template
  • Regional Differences
  • Criticism
  • Hardware Development
  • IEEE 829-1998
  • Testing Without a TestPlan
  •  
    Code Coverage
     
  • Introduction
  • Measures
  • Working
  • Statement Coverage
  • Branch Coverage
  • Path Coverage
  • Coverage criteria
  • Code coverage in practice
  • Tools
  • Features
  •  
    Quality Management
     
  • Introduction
  • Components
  • Capability Maturity Model
  • CMMI
  • Six Sigma
  •  
    Project Management
     
  • Introduction
  • PM Activities
  • Project Control Variables
  • PM Methodology
  • PM Phases
  • PM Templates
  • Agile PM
  •  
    Automated Testing Tools
     
  • Quick Test Professional
  • WinRunner
  • LoadRunner
  • Test Director
  • Silk Test
  • Test Partner
  • Rational Robot
  •  
    Performance Testing Tools
     
  • Apache JMeter
  • Rational Performance Tester
  • LoadRunner
  • NeoLoad
  • WAPT
  • WebLOAD
  • Loadster
  • OpenSTA
  • LoadUI
  • Appvance
  • Loadstorm
  • LoadImpact
  • QEngine
  • Httperf
  • CloudTest
  •  
    Languages
     
  • Perl Testing
  • Python Testing
  • JUnit Testing
  • Unix Shell Scripting
  •  
    Automation Framework
     
  • Introduction
  • Keyword-driven Testing
  • Data-driven Testing
  •  
    Configuration Management
     
  • History
  • What is CM?
  • Meaning of CM
  • Graphically Representation
  • Traditional CM
  • CM Activities
  • Tools
  •  
    Articles
     
  • What Is Software Testing?
  • Effective Defect Reports
  • Software Security
  • Tracking Defects
  • Bug Report
  • Web Testing
  • Exploratory Testing
  • Good Test Case
  • Write a Test
  • Code Coverage
  • WinRunner vs. QuickTest
  • Web Testing Tools
  • Automated Testing
  • Testing Estimation Process
  • Quality Assurance
  • The Interview Guide
  • Upgrade Path Testing
  • Priority and Severity of Bug
  • Three Questions About Bug
  •    
     
    Home » Testing Articles » Manual Testing Articles » V Model

    V Model

    A D V E R T I S E M E N T


    The V Model is an enhanced version of the classic waterfall model whereby each level of the development lifecycle is verified before moving on to the next level. With this model, testing explicitly starts at the very beginning, i.e. as soon as the requirements are written. Here, by testing we mean verification by means of reviews and inspections, i.e. static testing. This helps in identifying errors very early in the lifecycle and minimizes potential future defects appearing in the code later in the lifecycle.

    v_model

    Each level of the development lifecycle has a corresponding test plan. i.e. as each phase is being worked on, a test plan is developed to prepare for the testing of the products of that phase. Be developing the test plans, we can also define the expected results for testing of the products for that level as well as defining the entry and exit criteria for each level.

    In the V-Model the test activities are spelled out to the same level of detail as the design activities. Software is designed on the left-hand (downhill) part of the model, and built and tested on the right-hand (uphill) part of the model. Note that different organizations may have different names for the development and testing phases.

    The correspondences between the left and right hand activities are shown by the lines across the middle of the V, showing the test levels from component testing at the bottom, integration and system testing, and acceptance testing at the top level.

    Advantages

    • Each phase has specific deliverables.
    • Higher chance of success over the waterfall model due to the development of test plans early on during the life cycle.
    • Time concern in comparison with the waterfall model is low or even we can say 50% less.
    • Works well for small projects where requirements are easily understood.
    • Utility of the resources is high.

    Disadvantages

    • Very rigid, like the waterfall model.
    • Little flexibility and adjusting scope is difficult and expensive.
    • Software is developed during the implementation phase, so no early prototypes of the software are produced.
    • Model doesn't provide a clear path for problems found during testing phases.

    When to use this model

    • As per my knowledge I personally think / feel where time and cost is the constraints of the project then we can use such models for quick and cost effective delivery.
    • In comparison with waterfall model more or less same but the activity of testing starts very early, which leads to less time, and cost of the project.



    More Manual Testing Articles



    discussionDiscussion Center
    Discuss
    Discuss

    Query

    Feedback
    Yahoo Groups
    Y! Group
    Sirfdosti Groups
    Sirfdosti
    Contact Us
    Contact

    Looking for Software Testing eBooks and Interview Questions? Join now and get it FREE!
     
    A D V E R T I S E M E N T
       
       

    Members Login


    Email ID:
    Password:


    Forgot Password
    New User
       
       
    Testing Interview Questions
  • General Testing
  • Automation Testing
  • Manual Testing
  • Software Development Life Cycle
  • Software Testing Life Cycle
  • Testing Models
  • Automated Testing Tools
  • Silk Test
  • Win Runner
  •    
       
    Testing Highlights

  • Software Testing Ebooks
  • Testing Jobs
  • Testing Frequently Asked Questions
  • Testing News
  • Testing Interview Questions
  • Testing Jobs
  • Testing Companies
  • Testing Job Consultants
  • ISTQB Certification Questions
  •    
       
    Interview Questions

  • WinRunner
  • LoadRunner
  • SilkTest
  • TestDirector
  • General Testing Questions
  •    
       
    Resources

  • Testing Forum
  • Downloads
  • E-Books
  • Testing Jobs
  • Testing Interview Questions
  • Testing Tools Questions
  • Testing Jobs
  • A-Z Knowledge
  •    
    Planning
    for
    Study ABROAD ?


    Study Abroad


    Vyom Network : Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | Free eBooks | Job Interview Questions | Free Tutorials | Jokes, Songs, Fun | Free Classifieds | Free Recipes | Bangalore Info | GATE Preparation | MBA Preparation | Free SAP Training
    Privacy Policy | Terms and Conditions
    Sitemap | Sitemap (XML)
    Job Interview Questions | Placement Papers | SMS Jokes | C++ Interview Questions | C Interview Questions | Web Hosting
    German | French | Portugese | Italian