OneStopTesting - Quality Testing Jobs, eBooks, Articles, FAQs, Training Institutes, Testing Software, Testing downloads, testing news, testing tools, learn testing, manual testing, automated testing, load runner, winrunner, test director, silk test, STLC

Forum| Contact Us| Testimonials| Sitemap| Employee Referrals| News| Articles| Feedback| Enquiry
 
Testing Resources
 
  • Testing Articles
  • Testing Books
  • Testing Certification
  • Testing FAQs
  • Testing Downloads
  • Testing Interview Questions
  • Career In Software Testing
  • Testing Jobs
  • Testing Job Consultants
  • Testing News
  • Testing Training Institutes
  •  
    Fundamentals
     
  • Introduction
  • Designing Test Cases
  • Developing Test Cases
  • Writing Test Cases
  • Test Case Templates
  • Purpose
  • What Is a Good Test Case?
  • Test Specifications
  • UML
  • Scenario Testing
  • Test Script
  • Test Summary Report
  • Test Data
  • Defect Tracking
  •  
    Software testing
     
  • Testing Forum
  • Introduction
  • Testing Start Process
  • Testing Stop Process
  • Testing Strategy
  • Risk Analysis
  • Software Listings
  • Test Metrics
  • Release Life Cycle
  • Interoperability Testing
  • Extreme Programming
  • Cyclomatic Complexity
  • Equivalence Partitioning
  • Error Guessing
  • Boundary Value Analysis
  • Traceability Matrix
  •  
    SDLC Models
     
  • Introduction
  • Waterfall Model
  • Iterative Model
  • V-Model
  • Spiral Model
  • Big Bang Model
  • RAD Model
  • Prototyping Model
  •  
    Software Testing Types
     
  • Static Testing
  • Dynamic Testing
  • Blackbox Testing
  • Whitebox Testing
  • Unit Testing
  • Requirements Testing
  • Regression Testing
  • Error Handling Testing
  • Manual support Testing
  • Intersystem Testing
  • Control Testing
  • Parallel Testing
  • Volume Testing
  • Stress Testing
  • Performance Testing
  • Agile Testing
  • Localization Testing
  • Globalization Testing
  • Internationalization Testing
  •  
    Test Plan
     
  • Introduction
  • Test Plan Development
  • Test Plan Template
  • Regional Differences
  • Criticism
  • Hardware Development
  • IEEE 829-1998
  • Testing Without a TestPlan
  •  
    Code Coverage
     
  • Introduction
  • Measures
  • Working
  • Statement Coverage
  • Branch Coverage
  • Path Coverage
  • Coverage criteria
  • Code coverage in practice
  • Tools
  • Features
  •  
    Quality Management
     
  • Introduction
  • Components
  • Capability Maturity Model
  • CMMI
  • Six Sigma
  •  
    Project Management
     
  • Introduction
  • PM Activities
  • Project Control Variables
  • PM Methodology
  • PM Phases
  • PM Templates
  • Agile PM
  •  
    Automated Testing Tools
     
  • Quick Test Professional
  • WinRunner
  • LoadRunner
  • Test Director
  • Silk Test
  • Test Partner
  • Rational Robot
  •  
    Performance Testing Tools
     
  • Apache JMeter
  • Rational Performance Tester
  • LoadRunner
  • NeoLoad
  • WAPT
  • WebLOAD
  • Loadster
  • OpenSTA
  • LoadUI
  • Appvance
  • Loadstorm
  • LoadImpact
  • QEngine
  • Httperf
  • CloudTest
  •  
    Languages
     
  • Perl Testing
  • Python Testing
  • JUnit Testing
  • Unix Shell Scripting
  •  
    Automation Framework
     
  • Introduction
  • Keyword-driven Testing
  • Data-driven Testing
  •  
    Configuration Management
     
  • History
  • What is CM?
  • Meaning of CM
  • Graphically Representation
  • Traditional CM
  • CM Activities
  • Tools
  •  
    Articles
     
  • What Is Software Testing?
  • Effective Defect Reports
  • Software Security
  • Tracking Defects
  • Bug Report
  • Web Testing
  • Exploratory Testing
  • Good Test Case
  • Write a Test
  • Code Coverage
  • WinRunner vs. QuickTest
  • Web Testing Tools
  • Automated Testing
  • Testing Estimation Process
  • Quality Assurance
  • The Interview Guide
  • Upgrade Path Testing
  • Priority and Severity of Bug
  • Three Questions About Bug
  •    
     
    Home » Testing Certifications » Testing Certifications » ISTQB question pattern and tips to solve.

    ISTQB question pattern and tips to solve.

    A D V E R T I S E M E N T


    Testing Certifications

    ISTQB question pattern and tips to solve:
    ISTQB questions are formatted in such a way that the answers look very much similar. People often choose the one, which they are more familiar with. We should carefully read the question twice or thrice or may be more than that, till we are clear about what is being asked in the question.

    Now look at the options carefully. The options are chosen to confuse the candidates. To choose the correct answer, we should start eliminating one by one. Go through each option and check whether it is appropriate or not. If you end up selecting more than one option, repeat the above logic for the answers that you selected. This will definitely work.

    Before you start with the question papers, please read the material thoroughly. Practice as many papers as possible. This will help a lot because, when we actually solve the papers, we apply the logic that we know.

    ISTQB 'Foundation level' sample questions with answers:

    1. Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase

    a) Test Implementation and execution
    b) Test Analysis and Design
    c) Evaluating the Exit Criteria and reporting
    d) Test Closure Activities

    Evaluating the options:
    a) Option a: as the name suggests these activities are part of the actual implementation cycle. So do not fall under set-up
    b) Option b: Analysis and design activities come before implementation. The test environment set-up, identifying any required infrastructure and tools are part of this activity.
    c) Option c: These are post implementation activities
    d) Option d: These are related to closing activities. This is the last activity.

    So, the answer is 'B'

    2. Test Implementation and execution has which of the following major tasks?

    i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test harnesses and writing automated test scripts.
    ii. Creating the test suite from the test cases for efficient test execution.
    iii. Verifying that the test environment has been set up correctly.
    iv. Determining the exit criteria.

    a) i,ii,iii are true and iv is false
    b) i,,iv are true and ii is false
    c) i,ii are true and iii,iv are false
    d) ii,iii,iv are true and i is false

    Evaluating the options:
    Let's follow a different approach in this case. As can be seen from the above options, determining the exit criteria is definitely not a part of test implementation and execution. So choose the options where (iv) is false. This filters out 'b' and 'd'.

    We need to select only from 'a' and 'c'. We only need to analyze option (iii) as (i) and (ii) are marked as true in both the cases. Verification of the test environment is part of the implementation activity. Hence option (iii) is true. This leaves the only option as 'a'.

    So, the answer is 'A'

    3. A Test Plan Outline contains which of the following:-

    i. Test Items
    ii. Test Scripts
    iii. Test Deliverables
    iv. Responsibilities

    a) I,ii,iii are true and iv is false
    b) i,iii,iv are true and ii is false
    c) ii,iii are true and i and iv are false
    d) i,ii are false and iii , iv are true

    Evaluating the options:
    Let's use the approach given in question no. 2. Test scripts are not part of the test plan (this must be clear). So choose the options where (ii) is false. So we end up selecting 'b' and 'd'. Now evaluate the option (i), as option (iii) and (iv) are already given as true in both the cases. Test items are part of the test plan. Test items are the modules or features which will be tested and these will be part of the test plan.

    So, the answer is 'B'

    4. One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Identify the invalid Equivalence class
    a) 17
    b) 19
    c) 24
    d) 21

    Evaluating the options:
    In this case, first we should identify valid and invalid equivalence classes.

    Invalid Class | Valid Class | Invalid Class
    Below 18 | 18 to 25 | 26 and above

    Option 'a' falls under invalid class. Options 'b', 'c' and 'd' fall under valid class.

    So, the answer is 'A'

    5. In an Examination a candidate has to score minimum of 24 marks in order to clear the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalence values if the student clears the exam.

    a) 22,23,26
    b) 21,39,40
    c) 29,30,31
    d) 0,15,22

    Evaluating the options:
    Let's use the approach given in question 4. Identify valid and invalid equivalence classes.

    Invalid Class | Valid Class | Invalid Class
    Below 24 | 24 to 40 | 41 and above

    The question is to identify valid equivalence values. So all the values must be from 'Valid class' only.

    a) Option a: all the values are not from valid class
    b) Option b: all the values are not from valid class
    c) Option c: all the values are from valid class
    d) Option d: all the values are not from valid class

    So, the answer is 'C'

    6. Which of the following statements regarding static testing is false:

    a) static testing requires the running of tests through the code
    b) static testing includes desk checking
    c) static testing includes techniques such as reviews and inspections
    d) static testing can give measurements such as cyclomatic complexity

    Evaluating the options:
    a) Option a: is wrong. Static testing has nothing to do with code
    b) Option b: correct, static testing does include desk checking
    c) Option c: correct, it includes reviews and inspections
    d) Option d: correct, it can give measurements such as cyclomatic complexity

    So, the answer is 'A'

    7. Verification involves which of the following:-
    i. Helps to check the Quality of the built product
    ii. Helps to check that we have built the right product.
    iii. Helps in developing the product
    iv. Monitoring tool wastage and obsoleteness.

    a) Options i,ii,iii,iv are true.
    b) i is true and ii,iii,iv are false
    c) i,ii,iii are true and iv is false
    d) ii is true and i,iii,iv are false.

    Evaluating the options:
    a) Option a: The quality of the product can be checked only after building it.
    Verification is a cycle before completing the product.
    b) Option b: Verification checks that we have built the right product.
    c) Option c: it does not help in developing the product
    d) Option d: it does not involve monitory activities.

    So, the answer is 'B'

    8. Component Testing is also called as :-
    i. Unit Testing
    ii. Program Testing
    iii. Module Testing
    iv. System Component Testing .

    a) i,ii,iii are true and iv is false
    b) i,ii,iii,iv are false
    c) i,ii,iv are true and iii is false
    d) all of above is true

    Evaluating the options:
    a) Option a: correct, component testing is also called as unit testing
    b) Option b: not sure (but as all the options indicate this as true, we can conclude that Program testing is also called as unit testing)
    c) Option c: correct, component testing is also called as module testing
    d) Option d: wrong. System component testing comes under system testing.

    So, the answer is 'A'

    9. Link Testing is also called as :
    a) Component Integration testing
    b) Component System Testing
    c) Component Sub System Testing
    d) Maintenance testing

    Evaluating the options:
    As the name suggests, this testing is performed by linking (say modules). Now if
    we look at the options, only option 'a' is performed by linking or integrating
    modules/components.

    So, the answer is 'A'

    10.
    ISTQB questions 10

    What is the expected result for each of the following test cases?
    A.TC1: Anand is a 32 year old married, residing in Kolkatta.
    B.TC3: Attapattu is a 65 year old married person, residing in Colombo.
    a) A � Issue membership, 10% discount, B�Issue membership, offer no discount. B
    b) A � Don't Issue membership, B � Don't offer discount. C
    c) A � Issue membership, no discount, B � Don't Issue membership.
    d) A - Issue membership, no discount, B- Issue membership with 10% discount.

    Evaluating the options:

    ISYQB answer 10
    Explanation:
    For TC1: follow the path in green color
    (The person is Indian resident, so select only 'True' options.
    The person is aged between 18-55, so select only 'True'
    The person is a married, so again select only 'True'
    For this person, the actions under 'Rule 4′ will be applied. That is, issue membership and no discount)

    For TC3: follow the path in blue color
    (The person is not Indian resident, so select only 'False' (under Rule 1)
    The person is not aged between 18-55. No need to select any path, as it is written "Don't care".
    The person is married. No need to select any path, as it is written "Don't care".
    For this person, the actions under 'Rule1′ will be applied, That is, Don't issue membership and no discount.)

    So, the answer is 'C'

    Note: The answers are based on writers own experience and judgment and may not be 100% correct. If you feel any correction is required please discuss in comments below.



    More Tetsing Certification
    1 2 3 Next



    discussionDiscussion Center
    Discuss
    Discuss

    Query

    Feedback
    Yahoo Groups
    Y! Group
    Sirfdosti Groups
    Sirfdosti
    Contact Us
    Contact

    Looking for Software Testing eBooks and Interview Questions? Join now and get it FREE!
     
    A D V E R T I S E M E N T
       
       

    Members Login


    Email ID:
    Password:


    Forgot Password
    New User
       
       
    Testing Interview Questions
  • General Testing
  • Automation Testing
  • Manual Testing
  • Software Development Life Cycle
  • Software Testing Life Cycle
  • Testing Models
  • Automated Testing Tools
  • Silk Test
  • Win Runner
  •    
       
    Testing Highlights

  • Software Testing Ebooks
  • Testing Jobs
  • Testing Frequently Asked Questions
  • Testing News
  • Testing Interview Questions
  • Testing Jobs
  • Testing Companies
  • Testing Job Consultants
  • ISTQB Certification Questions
  •    
       
    Interview Questions

  • WinRunner
  • LoadRunner
  • SilkTest
  • TestDirector
  • General Testing Questions
  •    
       
    Resources

  • Testing Forum
  • Downloads
  • E-Books
  • Testing Jobs
  • Testing Interview Questions
  • Testing Tools Questions
  • Testing Jobs
  • A-Z Knowledge
  •    
    Planning
    for
    Study ABROAD ?


    Study Abroad


    Vyom Network : Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | Free eBooks | Job Interview Questions | Free Tutorials | Jokes, Songs, Fun | Free Classifieds | Free Recipes | Bangalore Info | GATE Preparation | MBA Preparation | Free SAP Training
    Privacy Policy | Terms and Conditions
    Sitemap | Sitemap (XML)
    Job Interview Questions | Placement Papers | SMS Jokes | C++ Interview Questions | C Interview Questions | Web Hosting
    German | French | Portugese | Italian