OneStopTesting - Quality Testing Jobs, eBooks, Articles, FAQs, Training Institutes, Testing Software, Testing downloads, testing news, testing tools, learn testing, manual testing, automated testing, load runner, winrunner, test director, silk test, STLC

Forum| Contact Us| Testimonials| Sitemap| Employee Referrals| News| Articles| Feedback| Enquiry
 
Testing Resources
 
  • Testing Articles
  • Testing Books
  • Testing Certification
  • Testing FAQs
  • Testing Downloads
  • Testing Interview Questions
  • Career In Software Testing
  • Testing Jobs
  • Testing Job Consultants
  • Testing News
  • Testing Training Institutes
  •  
    Fundamentals
     
  • Introduction
  • Designing Test Cases
  • Developing Test Cases
  • Writing Test Cases
  • Test Case Templates
  • Purpose
  • What Is a Good Test Case?
  • Test Specifications
  • UML
  • Scenario Testing
  • Test Script
  • Test Summary Report
  • Test Data
  • Defect Tracking
  •  
    Software testing
     
  • Testing Forum
  • Introduction
  • Testing Start Process
  • Testing Stop Process
  • Testing Strategy
  • Risk Analysis
  • Software Listings
  • Test Metrics
  • Release Life Cycle
  • Interoperability Testing
  • Extreme Programming
  • Cyclomatic Complexity
  • Equivalence Partitioning
  • Error Guessing
  • Boundary Value Analysis
  • Traceability Matrix
  •  
    SDLC Models
     
  • Introduction
  • Waterfall Model
  • Iterative Model
  • V-Model
  • Spiral Model
  • Big Bang Model
  • RAD Model
  • Prototyping Model
  •  
    Software Testing Types
     
  • Static Testing
  • Dynamic Testing
  • Blackbox Testing
  • Whitebox Testing
  • Unit Testing
  • Requirements Testing
  • Regression Testing
  • Error Handling Testing
  • Manual support Testing
  • Intersystem Testing
  • Control Testing
  • Parallel Testing
  • Volume Testing
  • Stress Testing
  • Performance Testing
  • Agile Testing
  • Localization Testing
  • Globalization Testing
  • Internationalization Testing
  •  
    Test Plan
     
  • Introduction
  • Test Plan Development
  • Test Plan Template
  • Regional Differences
  • Criticism
  • Hardware Development
  • IEEE 829-1998
  • Testing Without a TestPlan
  •  
    Code Coverage
     
  • Introduction
  • Measures
  • Working
  • Statement Coverage
  • Branch Coverage
  • Path Coverage
  • Coverage criteria
  • Code coverage in practice
  • Tools
  • Features
  •  
    Quality Management
     
  • Introduction
  • Components
  • Capability Maturity Model
  • CMMI
  • Six Sigma
  •  
    Project Management
     
  • Introduction
  • PM Activities
  • Project Control Variables
  • PM Methodology
  • PM Phases
  • PM Templates
  • Agile PM
  •  
    Automated Testing Tools
     
  • Quick Test Professional
  • WinRunner
  • LoadRunner
  • Test Director
  • Silk Test
  • Test Partner
  • Rational Robot
  •  
    Performance Testing Tools
     
  • Apache JMeter
  • Rational Performance Tester
  • LoadRunner
  • NeoLoad
  • WAPT
  • WebLOAD
  • Loadster
  • OpenSTA
  • LoadUI
  • Appvance
  • Loadstorm
  • LoadImpact
  • QEngine
  • Httperf
  • CloudTest
  •  
    Languages
     
  • Perl Testing
  • Python Testing
  • JUnit Testing
  • Unix Shell Scripting
  •  
    Automation Framework
     
  • Introduction
  • Keyword-driven Testing
  • Data-driven Testing
  •  
    Configuration Management
     
  • History
  • What is CM?
  • Meaning of CM
  • Graphically Representation
  • Traditional CM
  • CM Activities
  • Tools
  •  
    Articles
     
  • What Is Software Testing?
  • Effective Defect Reports
  • Software Security
  • Tracking Defects
  • Bug Report
  • Web Testing
  • Exploratory Testing
  • Good Test Case
  • Write a Test
  • Code Coverage
  • WinRunner vs. QuickTest
  • Web Testing Tools
  • Automated Testing
  • Testing Estimation Process
  • Quality Assurance
  • The Interview Guide
  • Upgrade Path Testing
  • Priority and Severity of Bug
  • Three Questions About Bug
  •    
     
    Home » Testing Articles » Manual Testing Articles » Bug Life Cycle

    Bug Life Cycle

    A D V E R T I S E M E N T


     In this tutorial you will learn about Bug Life Cycle & Guidelines, Introduction, Bug Life Cycle, The different states of a bug, Description of Various Stages, Guidelines on deciding the Severity of Bug, A sample guideline for assignment of Priority Levels during the product test phase and Guidelines on writing Bug Description.

    Introduction:

    Bug can be defined as the abnormal behavior of the software. No software exists without a bug. The elimination of bugs from the software depends upon the efficiency of testing done on the software. A bug is a specific concern about the quality of the Application under Test (AUT).

    Bug Life Cycle:

    In software development process, the bug has a life cycle. The bug should go through the life cycle to be closed. A specific life cycle ensures that the process is standardized. The bug attains different states in the life cycle. The life cycle of the bug can be shown diagrammatically as follows:

    The different states of a bug can be summarized as follows:

    1. New
    2. Open
    3. Assign
    4. Test
    5. Verified
    6. Deferred
    7. Reopened
    8. Duplicate
    9. Rejected and
    10. Closed

    Description of Various Stages:

    1. New: When the bug is posted for the first time, its state will be "NEW". This means that the bug is not yet approved.

    2. Open: After a tester has posted a bug, the lead of the tester approves that the bug is genuine and he changes the state as "OPEN".

    3. Assign: Once the lead changes the state as "OPEN", he assigns the bug to corresponding developer or developer team. The state of the bug now is changed to "ASSIGN".

    4. Test: Once the developer fixes the bug, he has to assign the bug to the testing team for next round of testing. Before he releases the software with bug fixed, he changes the state of bug to "TEST". It specifies that the bug has been fixed and is released to testing team.

    5. Deferred: The bug, changed to deferred state means the bug is expected to be fixed in next releases. The reasons for changing the bug to this state have many factors. Some of them are priority of the bug may be low, lack of time for the release or the bug may not have major effect on the software.

    6. Rejected: If the developer feels that the bug is not genuine, he rejects the bug. Then the state of the bug is changed to "REJECTED".

    7. Duplicate: If the bug is repeated twice or the two bugs mention the same concept of the bug, then one bug status is changed to "DUPLICATE".

    8. Verified: Once the bug is fixed and the status is changed to "TEST", the tester tests the bug. If the bug is not present in the software, he approves that the bug is fixed and changes the status to "VERIFIED".

    9. Reopened: If the bug still exists even after the bug is fixed by the developer, the tester changes the status to "REOPENED". The bug traverses the life cycle once again.

    10. Closed: Once the bug is fixed, it is tested by the tester. If the tester feels that the bug no longer exists in the software, he changes the status of the bug to "CLOSED". This state means that the bug is fixed, tested and approved.

    While defect prevention is much more effective and efficient in reducing the number of defects, most organization conducts defect discovery and removal. Discovering and removing defects is an expensive and inefficient process. It is much more efficient for an organization to conduct activities that prevent defects.

    Guidelines on deciding the Severity of Bug:

    Indicate the impact each defect has on testing efforts or users and administrators of the application under test. This information is used by developers and management as the basis for assigning priority of work on defects.

    A sample guideline for assignment of Priority Levels during the product test phase includes:

    1. Critical / Show Stopper � An item that prevents further testing of the product or function under test can be classified as Critical Bug. No workaround is possible for such bugs. Examples of this include a missing menu option or security permission required to access a function under test.
      .
    2. Major / High � A defect that does not function as expected/designed or cause other functionality to fail to meet requirements can be classified as Major Bug. The workaround can be provided for such bugs. Examples of this include inaccurate calculations; the wrong field being updated, etc.
      .
    3. Average / Medium � The defects which do not conform to standards and conventions can be classified as Medium Bugs. Easy workarounds exists to achieve functionality objectives. Examples include matching visual and text links which lead to different end points.
      .
    4. Minor / Low � Cosmetic defects which does not affect the functionality of the system can be classified as Minor Bugs.
    Ads

    Guidelines on writing Bug Description:

    Bug can be expressed as "Result followed by the action". That means, the unexpected behavior occurring when a particular action takes place can be given as bug description.

    1. Be specific. State the expected behavior which did not occur - such as after pop-up did not appear and the behavior which occurred instead.
    2. Use present tense.
    3. Don't use unnecessary words.
    4. Don't add exclamation points. End sentences with a period.
    5. DON'T USE ALL CAPS. Format words in upper and lower case (mixed case).
    6. Mention steps to reproduce the bug compulsorily.



    More Manual Testing Articles
    1 2 3 4 5 6 7 8 9 10 11 Next



    discussionDiscussion Center
    Discuss
    Discuss

    Query

    Feedback
    Yahoo Groups
    Y! Group
    Sirfdosti Groups
    Sirfdosti
    Contact Us
    Contact

    Looking for Software Testing eBooks and Interview Questions? Join now and get it FREE!
     
    A D V E R T I S E M E N T
       
       

    Members Login


    Email ID:
    Password:


    Forgot Password
    New User
       
       
    Testing Interview Questions
  • General Testing
  • Automation Testing
  • Manual Testing
  • Software Development Life Cycle
  • Software Testing Life Cycle
  • Testing Models
  • Automated Testing Tools
  • Silk Test
  • Win Runner
  •    
       
    Testing Highlights

  • Software Testing Ebooks
  • Testing Jobs
  • Testing Frequently Asked Questions
  • Testing News
  • Testing Interview Questions
  • Testing Jobs
  • Testing Companies
  • Testing Job Consultants
  • ISTQB Certification Questions
  •    
       
    Interview Questions

  • WinRunner
  • LoadRunner
  • SilkTest
  • TestDirector
  • General Testing Questions
  •    
       
    Resources

  • Testing Forum
  • Downloads
  • E-Books
  • Testing Jobs
  • Testing Interview Questions
  • Testing Tools Questions
  • Testing Jobs
  • A-Z Knowledge
  •    
    Planning
    for
    Study ABROAD ?


    Study Abroad


    Vyom Network : Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | Free eBooks | Job Interview Questions | Free Tutorials | Jokes, Songs, Fun | Free Classifieds | Free Recipes | Bangalore Info | GATE Preparation | MBA Preparation | Free SAP Training
    Privacy Policy | Terms and Conditions
    Sitemap | Sitemap (XML)
    Job Interview Questions | Placement Papers | SMS Jokes | C++ Interview Questions | C Interview Questions | Web Hosting
    German | French | Portugese | Italian