OneStopTesting - Quality Testing Jobs, eBooks, Articles, FAQs, Training Institutes, Testing Software, Testing downloads, testing news, testing tools, learn testing, manual testing, automated testing, load runner, winrunner, test director, silk test, STLC

Forum| Contact Us| Testimonials| Sitemap| Employee Referrals| News| Articles| Feedback| Enquiry
 
Testing Resources
 
  • Testing Articles
  • Testing Books
  • Testing Certification
  • Testing FAQs
  • Testing Downloads
  • Testing Interview Questions
  • Career In Software Testing
  • Testing Jobs
  • Testing Job Consultants
  • Testing News
  • Testing Training Institutes
  •  
    Fundamentals
     
  • Introduction
  • Designing Test Cases
  • Developing Test Cases
  • Writing Test Cases
  • Test Case Templates
  • Purpose
  • What Is a Good Test Case?
  • Test Specifications
  • UML
  • Scenario Testing
  • Test Script
  • Test Summary Report
  • Test Data
  • Defect Tracking
  •  
    Software testing
     
  • Testing Forum
  • Introduction
  • Testing Start Process
  • Testing Stop Process
  • Testing Strategy
  • Risk Analysis
  • Software Listings
  • Test Metrics
  • Release Life Cycle
  • Interoperability Testing
  • Extreme Programming
  • Cyclomatic Complexity
  • Equivalence Partitioning
  • Error Guessing
  • Boundary Value Analysis
  • Traceability Matrix
  •  
    SDLC Models
     
  • Introduction
  • Waterfall Model
  • Iterative Model
  • V-Model
  • Spiral Model
  • Big Bang Model
  • RAD Model
  • Prototyping Model
  •  
    Software Testing Types
     
  • Static Testing
  • Dynamic Testing
  • Blackbox Testing
  • Whitebox Testing
  • Unit Testing
  • Requirements Testing
  • Regression Testing
  • Error Handling Testing
  • Manual support Testing
  • Intersystem Testing
  • Control Testing
  • Parallel Testing
  • Volume Testing
  • Stress Testing
  • Performance Testing
  • Agile Testing
  • Localization Testing
  • Globalization Testing
  • Internationalization Testing
  •  
    Test Plan
     
  • Introduction
  • Test Plan Development
  • Test Plan Template
  • Regional Differences
  • Criticism
  • Hardware Development
  • IEEE 829-1998
  • Testing Without a TestPlan
  •  
    Code Coverage
     
  • Introduction
  • Measures
  • Working
  • Statement Coverage
  • Branch Coverage
  • Path Coverage
  • Coverage criteria
  • Code coverage in practice
  • Tools
  • Features
  •  
    Quality Management
     
  • Introduction
  • Components
  • Capability Maturity Model
  • CMMI
  • Six Sigma
  •  
    Project Management
     
  • Introduction
  • PM Activities
  • Project Control Variables
  • PM Methodology
  • PM Phases
  • PM Templates
  • Agile PM
  •  
    Automated Testing Tools
     
  • Quick Test Professional
  • WinRunner
  • LoadRunner
  • Test Director
  • Silk Test
  • Test Partner
  • Rational Robot
  •  
    Performance Testing Tools
     
  • Apache JMeter
  • Rational Performance Tester
  • LoadRunner
  • NeoLoad
  • WAPT
  • WebLOAD
  • Loadster
  • OpenSTA
  • LoadUI
  • Appvance
  • Loadstorm
  • LoadImpact
  • QEngine
  • Httperf
  • CloudTest
  •  
    Languages
     
  • Perl Testing
  • Python Testing
  • JUnit Testing
  • Unix Shell Scripting
  •  
    Automation Framework
     
  • Introduction
  • Keyword-driven Testing
  • Data-driven Testing
  •  
    Configuration Management
     
  • History
  • What is CM?
  • Meaning of CM
  • Graphically Representation
  • Traditional CM
  • CM Activities
  • Tools
  •  
    Articles
     
  • What Is Software Testing?
  • Effective Defect Reports
  • Software Security
  • Tracking Defects
  • Bug Report
  • Web Testing
  • Exploratory Testing
  • Good Test Case
  • Write a Test
  • Code Coverage
  • WinRunner vs. QuickTest
  • Web Testing Tools
  • Automated Testing
  • Testing Estimation Process
  • Quality Assurance
  • The Interview Guide
  • Upgrade Path Testing
  • Priority and Severity of Bug
  • Three Questions About Bug
  •    
     
    Home » Testing Articles » Testing - General Articles » How to Conduct Risk Management?

    How to Conduct Risk Management?

    A D V E R T I S E M E N T


    Creating and managing an application involve processes and activities that enable developers and testers to deliver quality products. One of these activities is risk managemrisk-managementent. Risk management may be done in different levels in the company. One of the basic levels of risk management can be found in the project level, especially in the context of software testing. It is important to understand that risks are problems that may or may not occur. Risks are treated differently from problems.

    There are different risks a project may be subjected to, such as legal liabilities, security, non-compliances with basic regulation, safety and project failure. There are different activities that testers may conduct in risk management and these are risk identification, risk prioritization and risk treatment. Risk identification depends on the project scope. These can be done with the use of different tools and methods. Testers may use project objectives, prior system knowledge, knowledge of system design, known industry practices, prior customer complaints and knowledge of system usage. A sample of a risk is when a known unstable system is tagged to be developed in future projects, this will be declared as a risk.

    It is important to have proper documentation of all the risks in the project. This will help project stakeholders to understand the impact of these risks to the project. There is a need for developers and testers to revisit this list as the project progress one step closer to deployment. This will help developers and testers to keep track of the risks if they have disappeared or if there are new risks that have appeared.

    Risk prioritization is ranking the risks on how urgent and important it should be addressed. Prioritizing risks is not difficult if the developers and testers have a complete understanding of the risks. Prioritization can be measured by risk impact and risk probability. Risk impact is measured by either money loss or a scale from 1 to 10. On the other hand, risk probability can be rank from 0 (no probability from occurring) or 1 (certain to occur). Combining risk impact and risk probability will give the team a risk magnitude. A total of risk magnitude will give the stakeholders tangible values of the risk involve in the project.

    The last step is risk treatment. Testers would decide and plan how to treat each risk. Theoretically, there are four ways of risk treatment and these are risk avoidance, risk transfer, risk mitigation and risk acceptance. Risk avoidance is postponement of developing application components for a later release. This is not usually done as this would have a huge project impact. Risk transfer is done by outsourcing the solution to another specialty company that would have the right resources to treat the risk. Risk mitigation is the most common risk treatment used by developers and testers as this would lower the risk impact. Risk acceptance is when a risk is not treated in prior releases and will be accepted in the current release as there is no available option for the team.

    Risk management is an important activity as this will bring more understanding to all project stakeholders. Project stakeholders should make sure that the risk assessment document is continuously reviewed and tracked all throughout the project. Test plans are synchronized with the updated risk assessment document. This will make creation of test scenarios easier for testers



    More Testing - General Articles



    discussionDiscussion Center
    Discuss
    Discuss

    Query

    Feedback
    Yahoo Groups
    Y! Group
    Sirfdosti Groups
    Sirfdosti
    Contact Us
    Contact

    Looking for Software Testing eBooks and Interview Questions? Join now and get it FREE!
     
    A D V E R T I S E M E N T
       
       

    Members Login


    Email ID:
    Password:


    Forgot Password
    New User
       
       
    Testing Interview Questions
  • General Testing
  • Automation Testing
  • Manual Testing
  • Software Development Life Cycle
  • Software Testing Life Cycle
  • Testing Models
  • Automated Testing Tools
  • Silk Test
  • Win Runner
  •    
       
    Testing Highlights

  • Software Testing Ebooks
  • Testing Jobs
  • Testing Frequently Asked Questions
  • Testing News
  • Testing Interview Questions
  • Testing Jobs
  • Testing Companies
  • Testing Job Consultants
  • ISTQB Certification Questions
  •    
       
    Interview Questions

  • WinRunner
  • LoadRunner
  • SilkTest
  • TestDirector
  • General Testing Questions
  •    
       
    Resources

  • Testing Forum
  • Downloads
  • E-Books
  • Testing Jobs
  • Testing Interview Questions
  • Testing Tools Questions
  • Testing Jobs
  • A-Z Knowledge
  •    
    Planning
    for
    Study ABROAD ?


    Study Abroad


    Vyom Network : Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | Free eBooks | Job Interview Questions | Free Tutorials | Jokes, Songs, Fun | Free Classifieds | Free Recipes | Bangalore Info | GATE Preparation | MBA Preparation | Free SAP Training
    Privacy Policy | Terms and Conditions
    Sitemap | Sitemap (XML)
    Job Interview Questions | Placement Papers | SMS Jokes | C++ Interview Questions | C Interview Questions | Web Hosting
    German | French | Portugese | Italian