Key Challenges of s/w testing: 1. Testing considered late in project 2. Requirements not testable 3. Integration is done after all components have been developed: This might result into full testing not being covered. 4. Complete testing is not possible
Key Challenges of s/w testing:
1. Testing considered late in project
2. Requirements not testable
3. Integration is done after all components have been developed: This might result into full testing not being covered.
4. Complete testing is not possible
What is meant by prototype in SDLC?
How GUI testing will be done in manual testing for a website?
What are starting links to test while website testing?
What is test scenario and test case? Please explain in detail?
Difference between strategic test plan & test plan?
What is back end testing using SQL?
How do you Test Application with having any requirement and Document?
What will be the Test case for ATM Machine & Coffee Machine?
What is the difference between stress, volume and load testing?
What is test deliverables?