Key Challenges of s/w testing: 1. Testing considered late in project 2. Requirements not testable 3. Integration is done after all components have been developed: This might result into full testing not being covered. 4. Complete testing is not possible
Key Challenges of s/w testing:
1. Testing considered late in project
2. Requirements not testable
3. Integration is done after all components have been developed: This might result into full testing not being covered.
4. Complete testing is not possible
When should testing be stopped?
What is 'good code'?
What is 'good design' in software programs?
What are the different types of software testing that can be considered?
Why does SmarteScript� take less time to learn?
I�ve never done automated software testing before. How long does it take to become proficient with SmarteScript�?
Can SmarteScript� be configured to select data randomly?
How easy it is to modify an existing test script?
How does SmarteScript� load functions?
What types of validations can SmarteScript� perform?