Test plan is a high level document which explains the test strategy,time lines and available resources in detail.Typically a test plan contains: -Objective -Test strategy -Resources -Entry criteria -Exit criteria -Use cases/Test cases -Tasks -Features to be tested and not tested -Risks/Assumptions.
.How can new Software QA processes be introduced in an existing organization?
Incremental integration testing ?
What is End-to-end testing?
What Is a Black box testing?
What makes a good Software QA engineer?
What if there isn't enough time for thorough testing?
How can it be known when to stop testing?
What if the software is so buggy it can't really be tested at all?
Was the bug reproducible?
What should be done after a bug is found?