Test plan is a high level document which explains the test strategy,time lines and available resources in detail.Typically a test plan contains: -Objective -Test strategy -Resources -Entry criteria -Exit criteria -Use cases/Test cases -Tasks -Features to be tested and not tested -Risks/Assumptions.
What kind of tools do I need to automate testing?
My testers are already swamped. Isn�t automation just more work?
Why should I be interested in test automation?
What is Recovery testing?
What is the diff between alpha testing and beta testing?
What is the Diff between static and dynamic?
What is the diff between walk through and inspection?
What is the diff between Integration & System Testing?
What is the Diff between Two Tier & Three tier Architecture?
What is the diff between Volume & Load?